This is the first stage and is always required.
Survey the trees within the development area and rate them in line with the British Standard 5837.
Ideally this should be carried out as part of the initial site design.
We will produce a comprehensive site report and a Tree Constraints Plan, based on the site plan, including all the tree data and showing above and below ground tree constraints.